Hill & Harbor wordmark

CRMC, DEM & Coastal Zoning

Build on the water without losing a year to paperwork.

CRMC, DEM and local zoning approvals can add months or years to a coastal project if they are not planned correctly. We manage design and the regulatory process together from the outset, so the calendar absorbs the approvals instead of being extended by them. See coastal design-build in Rhode Island on our Design-Build page.

Why It Matters to You

You find out what your lot allows before you spend on drawings.

Coastal construction demands more than standard planning. Material selection, structural design and permitting strategy must all be coordinated from the beginning. As a unified design-build firm, Hill & Harbor forecasts coastal-grade costs early and incorporates permitting requirements into design decisions.

Side entrance and stone patio at Project One Zero Eight, a coastal shingle home in Narragansett, Rhode Island

CRMC permitting

  • Preliminary Determination requests
  • Abbreviated Assent and Category A applications
  • Coastal setback and buffer analysis
  • Public hearing preparation and representation

DEM & environmental

  • Freshwater wetlands and stormwater compliance
  • DEM Wetlands Permit coordination
  • OWTS and septic design for waterfront lots
  • Simultaneous multi-agency permitting

Coastal construction

  • Floodplain and FEMA elevation compliance
  • Marine-grade material specifications
  • Engineered structural systems for wind loads
  • Foundation design for coastal soil conditions

Proven coastal expertise

Regulatory fluency that keeps complex projects moving.

Project TEN, Fogland

A coastal new build on an expansive corner lot steps from Fogland Beach. Our team coordinated CRMC and local coastal approvals alongside design and construction to deliver a multigenerational home with pool, guest cottage, and panoramic Sakonnet River views.

Project ONE ZERO EIGHT, Narragansett

A third-level addition and full renovation within a highly regulated coastal area. Our team managed local zoning requirements alongside necessary coastal approvals to deliver a seamless result.

Project THIRTY FOUR, Tiverton

A full coastal modern new build overlooking the Sakonnet River, requiring careful coordination of site conditions, materials and approvals, delivered on schedule.

Coastal timelines built in from day one.

CRMC permitting can range from weeks to eighteen months depending on site sensitivity. We build realistic regulatory timelines into every project schedule.

Our process

Questions

Common questions

The Coastal Resources Management Council regulates waterfront construction in Rhode Island. Setbacks, elevations and buffer rules shape what can be built. Hill & Harbor manages Preliminary Determinations, assent applications, and public hearing preparation from the start of design.

The coastal permitting process felt overwhelming until Hill & Harbor took ownership of it. They coordinated CRMC, local zoning and construction as one team, and our home came together exactly as envisioned.

Narragansett Client

Coastal renovation