In the world of luxury construction, there is a pervasive myth that high quality requires a slow timeline. Homeowners are often told to expect a 12 to 18-month schedule for a custom build, especially for complex sites on the water. Project Thirty Four in Tiverton proves that with the right integrated team, you do not have to choose between speed and craftsmanship.
The Challenge: A High-Stakes Timeline on the Sakonnet River The owners of this property wanted a sophisticated coastal modern home that capitalized on the sweeping views of the Sakonnet River. Standard industry timelines would have pushed their move-in date well into the following year. The challenge was to deliver a fully custom, architectural home with high-end finishes in nearly half the standard time, without cutting a single corner.
The Design-Build Efficiency: This project exemplifies the raw power of the design-build model. Because architecture and construction were unified under one roof, we eliminated the lag times and communication gaps that plague traditional projects. Decisions were made in real-time, materials were procured early, and site work began the moment permits were cleared. There was no “hand-off” delay between a separate architect and builder.
The Result: Precision Execution Completed in just 7.5 months, the home is a testament to precision project management. We delivered an open-concept layout filled with natural light, organic textures, and a seamless flow that connects the indoors to the riverfront landscape. It stands as proof that a seamless, professional process can deliver luxury faster than the industry standard.
See the result of this Coastal modern new construction Tiverton.